So fare the CHP System EnerTwin has been installed in about 200 different buildings in Europe, Amerika and South Africa.
February 17, 2021 by
Enertwin use cases
de Grandi Felice Gaetano

Find here some use cases for your reference:

  • School building with Cascade installation, (Germany)

  • Office building, (Germany)

  • Multifamily houses (5), (Germany)

  • Office building, (Italy)

  • Multifamily home, electricity demand driven installation, (Germany)

  • Single family home with swimming pool, (Switzerland)

  • School building with swimming pool, (United Kingdom)

  • Multifamily house, (Germany)

  • Office building with showroom, (Netherlands)

School Building With Cascade Installation

During the renovation of the school building the heating system was upgraded with 2 EnerTwins operating in a cascade arrangement.

The EnerTwins provide heat for heating of the school and the adjacent gym facility. Electricity is used in the school.


Location: Primary school, Dresden, Germany

Installation: Cascade of 2 EnerTwin in combination with boiler and a large buffer vessel

Annual estimated running hours: 7000hrs

Clarico-Image-Text
Clarico-Image-Text

Office Building

The EnerTwin is installed in a shared heating room for a 3 level office building. In this set-up, the EnerTwin is connected to a buffer vessel, which itself is connected to the main heating circuit of the building.


Location: Office building,

Dresden, Germany

Installation: EnerTwin installed in combination with a larger boiler.

Annual estimated running hours: 4500 hrs

Clarico-Image-Text
Clarico-Image-Text

Multifamily houses (x5)

Each of the 5 multi family homes has its own central heating room. Both heat and electricity are used within the appartments.


Location: 5 adjacent multilevel apartment buildings, Dresden, Germany

Installation: Each of the 5 EnerTwins is installed in combination with a peak boiler and 2 buffer vessels for heating and hot tap water production

Annual estimated running hours: 5000 hrs

Clarico-Image-Text
Clarico-Image-Text

Office Building

Within this office building the heat and electricity are provided and fully used within the building. The EnerTwin is supported with by a boiler for peak loads.


Location: Office building,

Rome, Italy

Installation: EnerTwin in combination with peak boiler and small buffer vessel

Annual estimated running hours: 3500 hrs

Clarico-Image-Text
Clarico-Image-Text

Multifamily home, electricity demand driven installation

The EnerTwin is operated based on electricity demand. Whenever the solar PV provides insufficient power for the apartments, the EnerTwin switches on and delivers both heat and electricity. Operation is done by modulating the system between 1-3 kWe, thus avoiding export of electricity to the grid.


Location: Multi family home, Meschede, Germany

Installation: Combined installation of solar PV, battery system, boiler, buffer vessel and EnerTwin. The EnerTwin is electricity demand driven.

Annual estimated running hours: 4000 hrs

Clarico-Image-Text

Single family home with swimming pool

The EnerTwin provides sufficient heat for the house (winter) and the swimming pool (summer). Electricity is used by the owner.


Location: Single family home with swimming pool, Weinfelden, Switzerland

Installation: EnerTwin is connected to the main buffer vessel, providing heating, hot water and pool heating

Annual estimated running hours: 4000+ hrs

Clarico-Image-Text

School building with swimming pool

The EnerTwin is separated from the main heating circuit by a plate heat exchanger, while the heat is used to heat the pool. Control is based on the temperature of the poolwater. Electricity is used in the school.


Location: Primary school, Newcastle, United Kingdom

Installation: EnerTwin in combination with 2 boilers.

Annual estimated running hours: 6500 + hrs

Clarico-Image-Text

Multifamily house

In a renovated complex the central heating room provides heating water and sanitary hot water. The system consist of a buffer vessel and a peak boiler.


Location: Group of 2 floor appartments, Dresden, Germany

Installation: EnerTwin combined with peak boiler and buffer vessel

Annual estimated running hours: 5000 hrs

Clarico-Image-Text
Clarico-Image-Text

Office building with showroom

The EnerTwin provides base load heat for the office and showroom. It replaced an old boiler.
The EnerTwin is supported by airco units to handle peak demand.

The produced electricity is used for charging the electric fork lift and to provide power to the offices and showroom.


Location: building materials company with office and showroom, Wanroij, The Netherlands

Installation: EnerTwin is connected to the heating circuit through a buffer vessel.

Annual estimated running hours: 4000+ hrs